The Quality Manual in 5 Days: documentation the certification body recognises
What this course is about
You have already started this course.
What this course does not cover (expand)
What a quality manual is today — and what the standard really requires
Since 2015 ISO 9001 no longer requires a manual. It requires “documented information” — at around twenty places, sometimes as a document to be maintained (scope, policy, objectives), sometimes as a record (audit report, inspection result, complaint). Anyone who serves these twenty places individually ends up with twenty files that nobody finds. That is why small companies bundle them in one document: the combined company and process manual.
| Before (up to 2008) | Today (ISO 9001:2015) |
|---|---|
| Manual mandatory, usually 80 to 150 pages | No manual required; extent according to size and complexity of the company |
| Six documented procedures mandatory | No mandatory procedures; processes must be documented “to the extent necessary” |
| Copy the clauses of the standard | Describe what the company does — the standard is only the checklist |
| Management representative mandatory | Role no longer mandatory; responsibility lies with top management |
The structure that has proven itself (25 to 40 pages):
- Ch. 0 Cover sheet with status, approval and scope; table of contents and change register
- Ch. 1 The company: context, interested parties, scope and exclusions (ISO 9001 clause 4)
- Ch. 2 Quality policy with management's statement of commitment (ISO 9001 clause 5.2)
- Ch. 3 Organisation: organisation chart as a table, roles and deputies (ISO 9001 clause 5.3)
- Ch. 4 Objectives, risks and opportunities (ISO 9001 clause 6)
- Ch. 5 Resources: people, infrastructure, measuring equipment, knowledge (ISO 9001 clause 7)
- Ch. 6 Process map and process descriptions: management, value creation, support (ISO 9001 clauses 4.4 and 8)
- Ch. 7 Measurement and improvement: KPIs, audit, management review, actions (ISO 9001 clauses 9 and 10)
- Ch. 8 Documented information: control, filing, retention, list of mandatory records (ISO 9001 clause 7.5)
Every section answers three questions: What do we do? Who is responsible? Where is the record? The auditor needs no more — and nobody in the company reads more. The download shows the structure with page guide values and the reference to the standard per section.
Five days, one plan: day 1 questionnaire and documents · day 2 context and scope · day 3 processes · day 4 policy, objectives, organisation · day 5 document control, mandatory records, approval. Per day three to four hours of concentrated work by the boss or quality manager; the days may be spread over two weeks.
The basic rule: only what is practised is described
The most frequent nonconformity in the certification audit of small companies is not “That is missing” but “That is in the manual but is not done”. The auditor reads: Suppliers are evaluated annually — and asks for the evaluation. If there is none, that is a nonconformity the company wrote for itself. That is why one single rule applies when writing: only what is practised in the company today is described. What is not yet practised goes into the chapter objectives as a quality objective with deadline — not into the manual as a claim.
The doorstep rule: stand at the door of your company and describe what happens behind it when an order comes in — not what should happen. Every sentence must be substantiable by a piece of paper, a screen or a person the auditor can ask.
| Typical hot air in the manual | What happens in the audit | Honest wording |
|---|---|---|
| “All employees are trained annually.” | Auditor: “Show me the training record of Mr X.” | “Training needs are determined in the annual review; records are in the personnel file.” |
| “Suppliers are evaluated regularly.” | “The last evaluation, please.” | “Suppliers are evaluated on complaint and once a year using the supplier list.” |
| “Documented work instructions apply to all activities.” | “Which ones? Where?” | “Work instructions exist for inspection stations A and B; all other activities run after briefing.” |
| “Customer satisfaction is measured systematically.” | “Last year's result?” | “Customer satisfaction is evaluated via complaint rate and repeat orders (KPIs ch. 7).” |
Cutting back an overly thick manual: print the old manual and mark every sentence with one of three signs — ✔ is practised and substantiable, ✘ is not practised, ? nobody knows. Everything with ✘ and ? is deleted or becomes an objective. In practice 30 of 100 pages remain, and those withstand every audit.
How you notice that you are writing too much: you use words of the standard that nobody in the company uses (“conformity”, “interested parties”, “documented information”). Write as you talk — the reference to the standard goes in brackets after it: Complaints (clauses 8.7, 10.2).
Day 1: The questionnaire — twelve sections from which the documentation emerges
Everything in the manual comes from answers to questions — and to the same questions in every company. That is why day 1 begins with a questionnaire: twelve sections, around 60 questions, two hours. Anyone who fills it in completely has 70 % of the manual in raw text.
| Section | Questions (selection) | Becomes in the manual |
|---|---|---|
| 1 Company | Name, legal form, locations, founding, number of employees, sector | Cover sheet, ch. 1 |
| 2 Products and services | What do you sell? To whom? What do you make yourself, what do you buy in? | Scope |
| 3 Customers and market | Main customers, customer groups, requirements (standards, certificates, lead times) | Context, interested parties |
| 4 Organisation | Who does what? Who deputises for whom? Who decides on quotations, purchasing, staff? | Organisation chart, roles |
| 5 Order flow | Enquiry → quotation → order → execution → inspection → delivery → invoice: who, with what, record? | Value creation process |
| 6 Purchasing | Suppliers, selection, evaluation, goods receipt inspection | S1, S2, S5 |
| 7 Staff | Hiring, briefing, training, records | M5, organisation chart |
| 8 Measuring equipment and infrastructure | Measuring instruments, calibration, machines, maintenance, IT | S6, S7 |
| 9 Complaints and nonconformities | What goes wrong? How is it recorded? Who decides? | S4, M4 |
| 10 Objectives and KPIs | What do you want to do better next year? What do you measure today already? | Ch. objectives, KPIs |
| 11 Filing and IT | Where are quotations, orders, delivery notes, certificates? Who may change? | Document control |
| 12 Special features | Laws, sector standards, customer specifications, exclusions (e.g. no design) | Context, exclusions |
Three rules when filling in: first, short answers — keywords, not sentences; the sentence is written on day 3. Second, “Don't know” is a permitted answer and marks a gap that goes into the manual as an objective. Third, note for every answer the document that exists for it (quotation template, supplier list, inspection record) — that becomes the column “record” in the process.
📄 Documentation questionnaire (Word, twelve sections) (German – English version to follow)
The questionnaire is fillable as a Word file. Anyone who hands it to a service provider gets the documentation made from it; anyone who writes himself works through it on days 2 to 5. Example of a completed questionnaire: module 15 (practice company Nordlicht).
Day 1: Collecting documents — what already exists is not written anew
The second biggest error after writing too much is writing twice: companies draw up a “QM quotation template” although the quotation template used for years is perfectly fine. The manual does not describe the template, it refers to it. That is why the second half of day 1 is pure collecting.
The collection list — available in almost every company:
| No. | Document | Serves as evidence for | Status |
|---|---|---|---|
| 1 | Quotation and order confirmation template | Clause 8.2 requirements for products | ☐ available ☐ missing |
| 2 | Terms and conditions or contract template | Clause 8.2.3 review of requirements | ☐ ☐ |
| 3 | Supplier list (name, product, evaluation) | Clause 8.4 | ☐ ☐ |
| 4 | Delivery note / inspection record / acceptance record | Clause 8.6 release | ☐ ☐ |
| 5 | Complaints of the last twelve months (e-mails are enough) | Clauses 8.7, 10.2 | ☐ ☐ |
| 6 | Organisation chart or list of responsibilities | Clause 5.3 | ☐ ☐ |
| 7 | Job descriptions or employment contracts with duties | Clause 7.2 | ☐ ☐ |
| 8 | Training records, certificates, briefings | Clause 7.2 | ☐ ☐ |
| 9 | List of measuring and inspection equipment with calibration dates | Clause 7.1.5 | ☐ ☐ |
| 10 | Maintenance plan, inspection logs (statutory inspections, electrical, ladders) | Clause 7.1.3 | ☐ ☐ |
| 11 | Laws and standards that apply to you (list) | Clauses 4.2, 8.2.2 | ☐ ☐ |
| 12 | Last customer survey, turnover list by customer | Clause 9.1.2 | ☐ ☐ |
Collection folder: create a folder QM with twelve subfolders, numbered like the list. Every document goes in
as a copy (or link). What is missing is not created on day 1 — it is marked “missing” in the list and on day
5 it is decided whether it becomes an objective or whether the statement in the manual is deleted.
Rule of thumb: if more than four of the twelve documents are missing, the company is not yet ready for certification in five days — then first two weeks of tidying up the company, then writing.
The filing from this collection list becomes the filing structure of the manual on day 5 (module 12). Anyone who sets it up this way from the start saves the move.
Day 2: Context and interested parties on one page
Clause 4 is the clause in which consultants write pages about “megatrends” and auditors leaf through pages. For a small company one page with two tables is enough. The standard wants to know: what influences your company from outside and inside (4.1)? Who makes requirements of you, and which (4.2)? Both must be “monitored and reviewed” — that happens once a year in the management review.
Table 1 — Context (4.1):
| Area | External issues (examples small company) | Internal issues |
|---|---|---|
| Market and customers | Price pressure from online providers; customers demand a certificate; dependence on two key customers | High share of regular customers; short lead times as a strength |
| Law and technology | Product safety law, sector standards, data protection; new machine generation | Old machine X, spare parts scarce; IT without backup concept |
| Staff and knowledge | Skills shortage in the region; apprenticeship market | Knowledge concentrated with the boss; two employees retire in five years |
| Supply chain | Lead times electronics; single supplier for component Y | Stock without system |
Table 2 — Interested parties (4.2):
| Party | What it expects from us | Relevant for the QMS? |
|---|---|---|
| Customers | On-time delivery, defect-free delivery, certificate, availability | Yes — KPIs on-time delivery, complaint rate |
| Employees | Clear responsibilities, safe workplaces, briefing | Yes — organisation chart, training |
| Suppliers | Clear orders, punctual payment | Yes — process purchasing |
| Legislator, authorities | Compliance with product safety, taxes, occupational safety | Yes, as far as product-related (list of standards and laws) |
| Bank, insurer | Evidence of orderly processes | No for the QMS; information in the management review |
| Owner | Profit, succession, preservation of value | Yes — objectives |
Every row with “Yes” must be found again elsewhere in the manual: as a process, KPI, objective or risk. That is the test auditors do — they take a party and ask: “Where do you take care of that?”
The external and internal issues are at the same time the raw list for the risks and opportunities (clause 6.1) — for that there is the separate course “Objectives, Risks and Opportunities”. In the manual there is only the reference: Risks and opportunities are derived from the context and evaluated annually (list of risks and opportunities).
Day 2: Wording scope and exclusions correctly
The scope is the one place where a sentence in the manual lands word for word on the certificate. It must be available as documented information (4.3) and name three things: which products and services, which locations, and which requirements of the standard are not applicable — with reasoning.
Sentence pattern for the scope:
“The quality management system applies to the [design,] manufacture and sale of [products] and [services] at the location [place]. Clause 8.3 (design and development) is not applicable, since products are manufactured exclusively to customer specification/catalogue.”
The certification body adopts the sentence; so check it for three things: does it contain only what you do today? Does it contain everything the customer wants to see on the certificate? Does it fit in two lines?
Exclusions — what works, what does not:
| Requirement | Not applicable if … | Typical reasoning | Does not work if … |
|---|---|---|---|
| 8.3 Design and development | You work to customer drawing, catalogue or fixed service catalogue | “No design of own products; manufacture to customer specification.” | You make quotations with own construction/concept, develop software individually or create recipes |
| 7.1.5.2 Measurement traceability | You measure nothing whose result demonstrates product conformity (retail, consulting, IT services) | “No measuring equipment is used to verify conformity.” | You check and release dimensions, weights, temperatures, pressures, voltages |
| 8.5.3 Property belonging to customers | You never have material, parts, data or devices of the customer in hand | rarely justifiable | You have customer data (IT!), customer parts for processing or loan devices — i.e. almost always applicable |
| 8.5.1 f) Validation of processes | Every output can be verified by subsequent inspection | “All process outputs are verified by final inspection.” | Welding, bonding, painting, heat treatment, software operation |
Two errors that certainly stand out in the audit: exclusion of 8.3 although the quotation contains “concept and planning” — then the quotation is the design. And: scope “services in the technical field” — too vague; the certification body demands something specific.
Retail companies: no own production process — therefore process validation and usually traceability are dropped; instead supplier evaluation, goods receipt, storage (8.5.4) and customer property (consignment goods, returns) gain weight. The manual says so expressly in the scope.
All exclusions are worded identically in the manual and in the application to the certification body. If they differ, the stage 1 audit begins with a discussion you do not need.
Day 3: Process list and process map — three levels, at most 15 processes
Clause 4.4 requires you to “determine” your processes: with inputs and outputs, sequence and interaction, criteria and KPIs, resources, responsible persons, risks and improvement. That sounds like a consultant's year and for a small company is one afternoon — if you start with the right number: one value creation process, five management processes, seven support processes. A company with 50 employees has no more, fewer is possible in very small companies (merge, do not leave out).
The process map as a table (a graphic is permitted but not required — the table is easier to check in the audit):
| Level | Processes | Purpose |
|---|---|---|
| Management (M) | M1 Management review · M2 Risks and opportunities · M3 Internal audit · M4 Action handling · M5 Training and competence | Steer |
| Value creation (V) | V1 Order processing: enquiry → quotation → order → procurement → execution → inspection → delivery → invoice → after-sales | Earn money |
| Support (S) | S1 Purchasing · S2 Goods receipt · S3 Customer satisfaction · S4 Customer complaints · S5 Supplier evaluation · S6 Maintenance of machines · S7 Monitoring of measuring equipment | Enable |
The process list — one row per process, the most important document in the manual:
| No. | Process | Responsible (role) | KPI | Related documents |
|---|---|---|---|---|
| V1 | Order processing | Management / sales | On-time delivery %, complaint rate % | Quotation template, order confirmation, delivery note, inspection record |
| S1 | Purchasing | Purchasing | Suppliers' delivery reliability %, goods receipt errors | Supplier list, purchase order template |
| … | … | … | … | … |
How to find your processes — in 30 minutes: take the last completed order and go through it from the first e-mail to the receipt of payment. Every handover from one person to another is a process step; everything that is needed “on the side” (supplier, employee, machine, measuring instrument) is a support process. Everything that happens once a year (audit, review, objectives) is a management process.
Objectives and KPIs, document control and organisation are not processes of their own but chapters of the manual (modules 10 to 13) — that keeps the process list short.
Interaction (4.4.1 b) is dealt with by the table: inputs of one process are outputs of another — the column “input/output” on the process page (next module) shows that. No arrow graphic needed.
The twelve management and support processes are so alike in small companies that you can adopt them as finished tables — module 8 and the download for it. The one process you really write yourself is V1.
Day 3: The process description as a table — one page per process
Flowcharts with diamonds are pretty and are never updated. The process description that has worked in small companies for thirty years is a table on one page with four fields:
1 Master data: process no., name, category (M/V/S), responsible (role), status. 2 Flow:
| No. | Activity | Responsible | Aids / document |
|---|---|---|---|
| 1 | Receive enquiry and check feasibility (deadline, capacity, material) | Sales | Enquiry e-mail, capacity overview |
| 2 | Prepare and release quotation | Sales / MD | Quotation template |
| 3 | Check order: does the order match the quotation? Send order confirmation | Sales | Order confirmation |
| 4 | Procure material (→ S1, S2) | Purchasing | Purchase order |
| 5 | Execute the order | Production / technology | Order file, work instruction |
| 6 | Check and release (check point) | Production | Inspection record |
| 7 | Deliver / hand over | Dispatch | Delivery note |
| 8 | Issue invoice | Accounting | Invoice |
| 9 | After-sales, complaint (→ S4) | Sales | Complaint form |
3 Input and output: input: customer enquiry, drawing/description of services, material. Output: delivered product, inspection record, invoice, customer feedback. 4 Notes: special cases, interfaces, KPIs, risks (one line is enough).
Rules for the value creation process V1: at most nine steps (otherwise split: V1 sales, V2 execution), exactly one check point that demonstrates the release to the customer (8.6) — not five; anyone who writes down five inspections must show five records. Presentation gladly as a swimlane (rows = roles, columns = steps), the check point marked green; but the table is in the manual as well.
Adopting the twelve standard processes: M1 Management review, M2 Risks and opportunities, M3 Internal audit, M4 Action handling, M5 Training and competence, S1 Purchasing, S2 Goods receipt, S3 Customer satisfaction, S4 Customer complaints, S5 Supplier evaluation, S6 Maintenance of machines, S7 Monitoring of measuring equipment — as finished four-field pages. You change only the column “responsible” (your roles) and delete what you do not do. Retail companies and pure service providers delete S6 and S7 or reduce them to vehicles, IT and scales.
The test at the end of day 3: give the page V1 to an employee who does not process the order and let him explain what is checked at step 6 and where that is written. If he cannot, the row is too imprecise — not the employee.
Day 3: Sector templates — what the value creation process looks like in 13 sectors
The value creation process is the only one you write yourself — but even that is not new in your sector. From more than 1,000 documentations typical sequences of steps can be derived for 13 sectors that serve as a starting point. You adapt what runs differently with you; usually that is two of nine steps.
| Sector | Typical steps V1 | The one check point (8.6) | Special feature |
|---|---|---|---|
| Manufacturing / metal / plastics | Enquiry → quotation to drawing → order confirmation → material → production → final inspection → dispatch → invoice | Final inspection to drawing with measuring equipment | Measuring equipment (7.1.5) and material traceability |
| Trades (joinery, metal construction, plumbing) | Site measurement → quotation → order → workshop → installation → acceptance → invoice | Acceptance at the customer with signature | Site measurement is determination of requirements (8.2.2) |
| Retail / specialist retail | Enquiry → quotation → order to supplier → goods receipt → storage → picking → delivery → invoice | Goods receipt and dispatch check | Supplier evaluation is the core; no production process |
| IT services / system house | Enquiry → concept and quotation → order → procurement → installation/configuration → function test → handover → invoice → support | Function test and handover record | Concept can be design (8.3); customer data = customer property (8.5.3) |
| Cleaning / building services | Site visit → schedule of services → contract → duty planning → execution → site check → invoice | Site check (sample, record) | Staff and briefing (7.2), keys = customer property |
| Logistics / transport | Enquiry → quotation → order → scheduling → collection → transport → delivery with receipt → invoice | Delivery receipt, absence of damage | External drivers = outsourced processes (8.4) |
| Consulting / engineering office | Initial meeting → quotation with description of services → order → processing → internal check (four eyes) → handover → invoice | Four-eyes check of the result | Design (8.3) usually applicable |
| Construction / fit-out | Tender/enquiry → calculation → quotation → order → construction → acceptance under construction contract rules → final invoice | Acceptance with record under construction contract rules | Subcontractors (8.4), site walk-through |
| Electrical / plant engineering | Enquiry → planning → quotation → order → installation → test to electrical safety standards → handover → invoice | Electrical test record | Statutory inspection duties in the list of standards and laws |
| Medical technology retail | Enquiry → quotation → purchase order → goods receipt with batch check → delivery → briefing → invoice | Batch/serial number check | Traceability (8.5.2), medical device regulation duties |
| Laboratory / testing service | Order → sample receipt → test → result check → report → invoice | Release of the test report by a second person | Measuring equipment and traceability central |
| Training / education | Enquiry → quotation → registration → delivery → learning assessment → certificate → invoice | Learning assessment / participant evaluation | Trainer qualification (7.2), customer property: participant data |
| Repair / service | Receipt with fault description → diagnosis → cost estimate → customer approval → repair → function check → return → invoice | Function check | Customer device = customer property (8.5.3), cost estimate = review of requirements |
How to use the template: take your sector, write the steps into the four-field table and check every row against the last real order. Two things almost always differ: who releases (with you perhaps the boss instead of production) and how the order comes in (telephone instead of e-mail). Change both — do not defend the template.
📄 Process descriptions V1 for 13 sectors as four-field tables (German – English version to follow)
Mixed companies (retail plus service, manufacturing plus installation) write two value creation processes V1 and V2 with one check point each — not one with eighteen steps.
Day 4: Quality policy and objectives — one page of policy, one table of objectives
The quality policy is the document most often copied from the internet — and the auditor notices that in the first minute, because he asks the employee in production: “What is in your policy?” The standard requires the policy to be communicated, understood and applied (5.2.2). So: half a page, in your words, with four mandatory contents.
| Mandatory content (5.2.1) | What is meant | Example sentence small company |
|---|---|---|
| a) Appropriate to purpose and context | Fits what you do | “We manufacture individual parts and small series for mechanical engineering in the region — fast, dimensionally accurate, reliable.” |
| b) Framework for quality objectives | An objective must be derivable from every sentence | “On-time delivery is our most important promise.” → objective: on-time delivery ≥ 95 % |
| c) Commitment to satisfy requirements | Customer requirements, laws, standards | “We satisfy the requirements of our customers and the applicable laws and standards.” |
| d) Commitment to continual improvement | Not “zero defects” but “getting better” | “We continually improve our quality management system.” |
Below it management's statement of commitment — two sentences, place, date, signature of the owner or managing director. That is at the same time the evidence for 5.1.1 (leadership and commitment). Communication: notice in the break room or intranet, mention in the next meeting with a minutes line — no more.
Quality objectives (6.2): six to nine objectives — the six standard objectives of small companies (turnover, quotation hit rate, complaints, customer satisfaction, supplier evaluation, certification) plus one to three company-specific ones —, each with six items, as a table in the manual or as a sheet of its own (the manual then refers to it). Three example rows:
| Objective | Measure and target value | Actual value | Responsible | Deadline | Actions / means |
|---|---|---|---|---|---|
| Increase on-time delivery | Share of on-time deliveries ≥ 95 % | 88 % | MD | 31 Dec | Weekly capacity planning, buffer in order confirmation |
| Reduce complaints | Complaint rate ≤ 1.5 % of orders | 2.4 % | Production | 31 Dec | Check point before dispatch, defect tally sheet |
| Introduce supplier evaluation | All A suppliers evaluated | 0 | Purchasing | 30 Jun | Evaluation sheet from S5, two hours per quarter |
The third example shows the rule from module 2: what is not yet practised is an objective, not a claim. Every objective needs a number you can collect today already — otherwise it is a wish. The objectives are evaluated in the management review and set anew annually; for that there is the separate course “Objectives, Risks and Opportunities”.
What does not belong in the policy: environmental protection, occupational safety, data protection — unless you have that audited too. Every sentence that stands there is audited.
Day 4: Organisation chart, roles and deputies — roles instead of names
Clause 5.3 requires responsibilities and authorities to be “assigned, communicated and understood”. A table is enough for that — and it lasts longer than a box organisation chart if you keep one rule: roles are in the manual, not names. Otherwise you have to re-approve the manual at every change of staff. The assignment person → role is on a sheet of its own that you maintain without a manual change.
Organisation chart as a table:
| Role | Duties (short form) | Authorities | Deputy |
|---|---|---|---|
| Management (MD) | Strategy, customers, staff, approval of policy and manual, management review | All; quotation release > 10,000 | Deputy MD |
| Quality manager — optional | Maintenance of manual, audit programme, action tracking, KPIs | Release documents; block products | MD |
| Sales / order acceptance | Enquiries, quotations, order confirmation, customer contact | Quotations up to 10,000 | MD |
| Purchasing | Suppliers, purchase orders, goods receipt | Purchase orders up to 5,000 | Sales |
| Production / technology / execution | Order execution, inspection and release, measuring equipment | Release for delivery; blocking of nonconforming parts | MD |
| Accounting / administration | Invoices, personnel files, filing | – | MD |
The five-person company: one person can have several roles — the boss is MD, sales and quality manager, the foreman is production and purchasing. That is permissible; only the deputy must always be a different person. With two persons in the company the deputy of the boss honestly reads: “external (accountant/partner company) for invoicing and customer contact; orders rest”. That is better than an invented deputy.
What the standard no longer requires: a management representative. The duties (5.3 a to e) must be assigned, but top management can keep them. In companies of up to ten employees the boss is usually the quality manager himself — then it says so.
Deputy rule as a sentence in the manual: “Every role has a named deputy (table). In case of absence of more than two weeks the deputy takes over all authorities of the role.” One sentence that really helps in the audit and in the company.
The job descriptions from day 1 (collection list no. 7) are only referenced in the table, not copied. Evidence of competence (7.2) is in the personnel file — the manual says that it is there.
Day 5: Document control without stamps — filing, identification, change
Document control sounds like stamp, distribution list and revision number. The standard requires none of that. It requires (7.5.2) that documents are identified (title, date, author or number), have a suitable format and are reviewed and approved before use; and (7.5.3) that they are available, protected, distributed, changed, retained and disposed of — controlled. For a small company that means: one folder structure, one naming rule, one footer, one table.
The naming rule: Documentname_YYYY-MM-DD.docx — the date in the file name is the status. A revision number
is not necessary; two files with different dates cannot be confused. The footer of every template carries the
same status and the document name.
The folder structure (the twelve subfolders of the collection folder from day 1 are sorted in here):
| Folder | Content | Who may change | Retention |
|---|---|---|---|
| 01 Manual | Manual (PDF approved, DOCX working version), process list, organisation chart persons | MD / quality manager | Previous status one year in the subfolder “Archive” |
| 02 Templates | Quotation, order confirmation, delivery note, inspection record, complaint, purchase order, training record | Quality manager | Only the current version in the folder |
| 03 Records | Completed templates by year and transaction | All (add only) | 10 years (business records, product liability — check your country) |
| 04 External documents | Standards, laws (list), customer drawings, supplier certificates | Quality manager (filing), nobody (content) | As long as valid; mark old drawing revisions |
| 05 Management | Objectives, risks, audit programme, audit reports, management review, action plan | MD / quality manager | 10 years; audit programme, audit plans and audit reports at least 3 years |
Approval by filing: what is in the folder “02 Templates” is approved — because only the quality manager may write there. That is the whole approval rule; it is in the manual like that. For the manual itself: approval by the MD's signature on the cover sheet (PDF), the DOCX is the working version.
Change register: a table at the end of the manual — status, section, change, approval. Three rows a year are normal; zero rows in two years mean for the auditor: the manual is not alive.
External documents (7.5.3.2 d): customer drawings and standards must be “identified and controlled” — that means: you know which revision applies, and the old one is not at the inspection station. You own standards as a purchase or have access (national standards body, association); you should own ISO 9001 itself.
Paper or digital? Both are permitted; do not mix per document. Anyone who works digitally needs an answer to “Backup?” (protection, 7.5.3.1 b) — one sentence: “Daily backup to [NAS/cloud], restore tested annually.” And then really test it.
Day 5: The mandatory records — what the standard wants to see retained
The standard distinguishes documented information to be maintained (documents that apply: scope, policy, objectives, processes) and to be retained (records that demonstrate: inspection results, audit reports, training records). Both together are around twenty places. Anyone who keeps them as a table in the manual has an answer with a place for every question “Show me …” in the audit.
| Clause | What is required | Document in a small company | Place |
|---|---|---|---|
| 4.3 | Scope | Manual ch. 1 | 01 Manual |
| 4.4.2 | Processes: documents for operation, records as evidence | Process list, process pages | 01 Manual |
| 5.2.2 | Quality policy | Manual ch. 2, notice | 01 Manual |
| 6.2.1 | Quality objectives | Objectives table | 05 Management |
| 7.1.5.1 | Fitness of monitoring and measuring resources | Measuring equipment list | 02/03 |
| 7.1.5.2 | Calibration / traceability | Calibration certificates, measuring equipment list with date | 03 Records |
| 7.2 | Competence | Training records, certificates, briefing record | Personnel file |
| 8.1 | Confidence that processes run as planned; conformity of products | Order file, inspection record | 03 |
| 8.2.3.2 | Results of the review of requirements, new requirements | Quotation, order confirmation, change note | 03 |
| 8.3.2–8.3.6 | Design: planning, inputs, controls, outputs, changes | Design file (only if 8.3 applicable) | 03 |
| 8.4.1 | Evaluation, selection, monitoring of suppliers | Supplier list with evaluation | 02/03 |
| 8.5.1 | Characteristics of products, activities, results | Drawing, work instruction, order file | 03 / 04 |
| 8.5.2 | Traceability (where required) | Batch/serial number on delivery note and inspection record | 03 |
| 8.5.3 | Customer property: loss, damage, notification to customer | E-mail/note in the complaint form | 03 |
| 8.5.6 | Changes in production/service provision | Change note in the order file | 03 |
| 8.6 | Release: evidence of conformity, releasing person | Inspection record, delivery note with signature | 03 |
| 8.7.2 | Nonconformity: description, action, concession, authority | Complaint/nonconformity form | 03 |
| 9.1.1 | Results of monitoring and measurement | KPI sheet | 05 |
| 9.2.2 | Audit programme and audit results | Audit programme, audit report | 05 |
| 9.3.3 | Results of the management review | Management review report | 05 |
| 10.2.2 | Nonconformities, actions, results | Action plan | 05 |
Three observations from audits: first: 7.2 (evidence of competence) is missing most often — not the training, the record. A briefing record with two signatures is enough. Second: 8.2.3.2 is overlooked — the evidence that you checked the order against the quotation; the order confirmation meets that if it is really sent. Third: 8.5.3 customer property — anyone who is an IT service provider, cleaner or repair business constantly has customer property and needs a line on it.
What is not required: minutes of every meeting, distribution lists, read confirmations, form registers with revision status. Anyone who keeps such things keeps them for himself — not for the standard.
Day 5: Review and approval — the manual test before the auditor
Before approval someone who did not write the manual checks it — in a small company the boss if the quality manager wrote it, or an employee from production if the boss wrote it. The check takes two hours and follows a list; the most important points:
A Completeness (standard): scope with exclusions and reasoning · context and interested parties · policy with four mandatory contents and signature · objectives measurable with deadline · organisation chart with deputies · process list and process pages for all processes · KPIs per process · audit, management review, actions described · document control with filing · list of mandatory records.
B Practised test (the rule from module 2): pick ten random sentences with “is”, “are”, “takes place” — for each the checker must find the evidence within two minutes. One sentence without evidence: delete or make it an objective. More than three sentences without evidence: the manual is not ready.
C Consistency: scope, exclusions and process list fit together (no process “design” with exclusion of 8.3; no measuring equipment list with exclusion of 7.1.5.2) · roles in the organisation chart = roles in the process pages · document names in the process pages = file names in folder 02 · KPIs in the process list = KPIs in the objectives.
D Form: no personal names · status in file name and footer · page numbers · table of contents · 25 to 40 pages · words of the standard only in brackets · change register with first row “first edition”.
📄 Manual checklist: 25 points in four blocks with rating column (German – English version to follow)
Approval: signature of management on the cover sheet of the PDF version, date = status. The PDF goes into folder 01, the DOCX becomes the working version. Communication: short presentation in the next meeting (20 minutes: process map, policy, “where do I find what”), minutes line with participants — that is the evidence for 5.2.2 and 7.3 (awareness).
30-day run-in: the manual is finished on day 5 but not yet proven. For four weeks the quality manager notes every sentence that does not match everyday reality on a sheet; after 30 days status 2 follows with these corrections. Only then should the stage 1 audit take place. Certification bodies like to see a manual with two statuses and a filled change register — it proves that it is used.
Case study: Nordlicht IT Service writes its manual in five days
Nordlicht IT Service (fictitious) in Flensburg, Germany, looks after about 60 small companies in the region with nine employees: network, servers, workstations, Microsoft 365 set-up, maintenance contracts, hotline. A customer from medical technology demands an ISO 9001 certificate by the end of June 2023. In January 2023 the managing director (at the same time sales and quality manager) blocks five mornings.
Day 1 — questionnaire and collection list: questionnaire in 90 minutes. Collection list: 10 of 12 documents available or dropped with reasons; the supplier list has no evaluation yet, briefing records are missing. Decision: supplier evaluation and briefing record become objectives; there is no measuring equipment (only diagnostic software that demonstrates no conformity) → exclusion of 7.1.5.2 examined.
Day 2 — context and scope: external issues: skills shortage, cyber attacks on customers, manufacturer certifications. Interested parties: customers (response time, data security), manufacturers (partner status), legislator (data protection — relevant because customer data = customer property). Scope: “IT services: planning, installation, operation and support of IT infrastructures for small and medium-sized companies at the location Flensburg.” Decision 8.3: not excluded — the “planning” (concepts for customers) is design of a service; Nordlicht describes it as step 2 in V1 with concept review. 8.5.3 customer property: applicable (customer data, access data, loan devices).
Day 3 — processes: process list with V1 project order (9 steps, check point “function test and handover record”), V2 maintenance and support (ticket → processing → solution → customer feedback → invoicing, check point “customer confirms solution”), five M and six S processes (S7 monitoring of measuring equipment deleted, S6 limited to vehicles and IT). KPIs: hotline response time, share of tickets solved within 8 hours, project on-time delivery, complaints.
Day 4 — policy and organisation: policy in six sentences; six quality objectives O1–O6 (three of the six standard objectives plus three company-specific); organisation chart with seven roles for nine persons (MD = sales = quality manager; two technician teams; hotline; administration). Deputy MD: lead technician.
Day 5 — control, mandatory records, approval: filing in the existing document management, naming rule with date, list of mandatory records with 19 rows (8.3 applicable, 7.1.5 excluded), check by the lead technician, three corrections, approval.
Exercise — three hidden errors in the draft: in the sample manual draft (download 10) there are three errors as they would stand out in the audit. Find them before you open the approved sample manual (download 11). Hints: one concerns module 2, one module 6, one module 11.
Time balance Nordlicht: 5 × 3.5 hours MD + 2 hours check + 1 hour meeting = 20.5 hours. Stage 1 audit six weeks later without document nonconformity; stage 2 with two minor nonconformities (training record hotline, supplier evaluation not yet begun — the objective was set, but without interim status). Certified since May 2023.
Records: What remains from the five days — and how the certification body reads it
At the end of the five days ten things are available — and exactly these ten the auditor picks up in the stage 1 audit. Stage 1 is the document review: he reads the manual, checks scope and exclusions, looks whether policy, objectives, processes, audit and management review are described, and decides whether stage 2 (the audit in the company) can take place. A manual according to this course usually passes stage 1 without rework.
| No. | Result | Reference to the standard | What the auditor does with it |
|---|---|---|---|
| 1 | Manual (PDF, approved, 25–40 pages) | 7.5 | Reads it before the audit day; basis of the audit plan |
| 2 | Scope with exclusions | 4.3 | Adopts it onto the certificate; checks the reasoning |
| 3 | Process list and process pages | 4.4 | Selects processes for stage 2; asks for KPIs |
| 4 | Quality policy, signed | 5.2 | Asks employees about it |
| 5 | Objectives table | 6.2 | Checks measurability; asks for actual values in stage 2 |
| 6 | Organisation chart (roles) + persons sheet | 5.3 | Checks deputies; compares with process pages |
| 7 | Filing structure and naming rule | 7.5.3 | Has a document shown to him in the company |
| 8 | List of mandatory records | 7.5.1 | Works through it row by row in stage 2 |
| 9 | Change register | 7.5.2 | Sees whether the manual is alive |
| 10 | Minutes of the communication | 5.2.2, 7.3 | Evidence of awareness |
Maintenance in the annual rhythm: the manual is not “maintained”, it is used — and once a year, before the management review, reviewed in two hours: process list still right? Roles still filled? KPIs still the ones you measure? Every change into the change register, new status, signature. No more is necessary; less stands out in the surveillance audit.
What you have now and what is still missing: with the manual the QMS is described — not operated. The next courses of the Academy fill the parts the manual refers to: objectives, risks and opportunities (M2), the order from enquiry to invoice (V1 in detail), suppliers, people, measuring equipment (S1, S2, S5, M5, S7), complaints and KPIs (S3, S4), internal audit (M3), management review (M1, M4).
The rating grid is at the same time the exercise for the course close: rate your own manual or the sample manual Nordlicht. Below 14 of 20 points “mature” the stage 1 audit should not yet be booked.
Procedure in our company
Your company completes this module. The general part of the training ends here; what follows, only your company knows:
| Item | What is recorded |
|---|---|
| Contact person | Who is the quality manager or contact person for quality questions? Who deputises? |
| Documents and templates | Where are the manual, the process sheets and the templates used for this topic (folder, cloud, paper)? |
| Records | Where are the records on this topic filed, and for how long are they kept? |
| Approval | Who approves documents, changes and decisions on this topic? |
| Dates | Which fixed dates apply (internal audit, management review, external audit)? |
Companies with a company account of the Academy receive this module with their own details; participants then see the names, dates and filing locations of their company. Without customisation: ask your management or your quality manager where these details are laid down in your company — usually in the quality manual.
Final test
36 questions, one correct answer each. You need 29 correct answers to pass (80 %). Scoring happens on the server — there is no answer key on this page.
Your result
Certificate on LinkedIn
How helpful was this course?
Should your colleagues take it too?
Pass the course link on – free, no registration. With a company code all certificates end up in the same company account.
What happens next
Have the documentation created for you: From the completed questionnaire we create the complete document package (manual, processes, templates) at a fixed price – with your logo and your workflows.
Company-specific add-on: Module “Procedures in your own company” as a fixed-price adaptation with your templates and your filing structure.
The next courses: “Objectives, Risks and Opportunities” and “The Order from Enquiry to Invoice” in the Academy – both build on the manual.
More free training courses are available in the Online Academy (German). Questions about implementation in your company: use the contact form.
Questions about the content of this training: Holger.grosser@iso9001.info · phone 0911-49522541. Online training fulfils the legal training duty only if you can ask the trainer questions.