Internal Audit ISO 9001 in a Small Company – practice course
What this course is about
You have already started this course.
What this course does not cover (expand)
What an internal audit really is – and the three mistakes of the first time
An internal audit is not an inspection round and not an examination on the standard. ISO 9001 clause 9.2.1 names two questions, no more: Does the QM system conform to the company's own requirements and to the requirements of the standard – and is it effectively implemented? Translated for a company with twelve employees: Do we do what we say in the manual, and does it achieve anything?
This course is the practical part of the online training “Internal Auditor ISO 9001”. That course contains the method according to ISO 19011; this one is about half a day in your own company – with questions, checklists and a practice company on which you play everything through once before you do it for real.
The three mistakes almost everyone makes in the first audit
| Mistake | How you recognise it | What helps instead |
|---|---|---|
| Asking about the standard instead of the order | “Have you implemented clause 8.4?” – silence | “Let us take your last purchase order: how did you come to this supplier?” |
| Criticising everything | 14 findings, 10 of them matters of taste | Only what the standard or the manual requires is a nonconformity |
| A report nobody reads | 12 pages, clauses of the standard as headings | 2 to 4 pages: result in one sentence, strengths, findings with evidence |
What the course delivers
Eight sections along a real audit day: planning, asking, sectors, findings, report, external audit, final project. Each module comes with a download. All questions and evidence come from more than 1,000 audits in small and medium-sized companies – anonymised, without company or personal names.
Practice company: Schreinerei Waldner GmbH, a joinery (fictitious, 14 employees, windows and front doors, interior fitting and made-to-measure furniture, certified since 2024). Download the folder now and read it once like an auditor: What is defined, what is actually done, where is the gap? Six observations are hidden in it.
📄 Practice company Waldner – document folder (PDF, 8 pages) (German – English version to follow)
Key point
An internal audit checks whether the company does what it says – not whether it knows the standard by heart.
What the certification body expects of the internal audit
Clause 9.2.2 of ISO 9001 is short. It requires six things – and only these six:
- an audit programme with frequency, methods, responsibilities, planning and reporting, which takes into consideration the importance of the processes, changes and the results of previous audits;
- criteria and scope for each audit;
- auditors who ensure objectivity and impartiality;
- reporting of the results to relevant management;
- corrections and corrective actions without undue delay;
- documented information as evidence of the programme and the results.
A certification auditor reads your internal audit report as early as stage 1 – before the actual audit. In doing so the auditor checks four things:
| Check point | Question of the certification body | Sufficient in a small company |
|---|---|---|
| Completeness | Were all processes audited in the cycle, including the management review? | One system audit covering everything, once a year |
| Independence | Did somebody audit their own area? | Crosswise: the quality manager audits the others, the MD or a colleague audits the quality manager's area |
| Evidence | Does every finding say what was seen and what it violates? | Order number, date, clause of the standard or place in the manual |
| Effectiveness | Did last year's actions work, and is the result in the management review? | Action plan with completion date and check of effectiveness |
What is not required
No certified auditor. No catalogue of questions by clause of the standard. No report of more than ten pages. No audit per process with its own report. No software. Many auditors would like a three-year matrix – what is mandatory is only a programme that shows when what is audited.
The three points at which external auditors most often probe
- The quality manager has audited himself or herself.
- Findings without evidence or without reference to the standard.
- Actions without cause and without a check of effectiveness (“employees made aware”).
📄 Checklist minimum requirements internal audit (PDF) (German – English version to follow)
Key point
Complete, independent, evidenced, effective – the certification body checks nothing more about your internal audit.
Planning in one hour: audit programme and audit plan
Two documents, two purposes. The audit programme says when which process has its turn – over one year or over the certificate cycle of three years. The audit plan says how the audit day runs.
Audit programme: one sheet for three years
The standard requires that the programme takes into consideration the importance of the processes, changes and results of previous audits. In a small company this means: processes with complaints, new employees or an observation from the last external audit have their turn every year; stable secondary processes are enough every two or three years. A company with fewer than 20 employees does best with one system audit per year covering all processes – the programme is then one line per year plus the focal points.
Audit plan: half a day is enough
The order follows the order flow, not the clauses of the standard: leadership – sales – purchasing – production/service – installation/handover – complaints. That way one and the same order travels through the whole audit, and every interviewee shows their part of it.
| Time | Area | Interviewee | Auditor |
|---|---|---|---|
| 08:00 | Opening (15 min) | all | quality manager |
| 08:15 | Leadership: objectives, risks, management review | MD | quality manager |
| 09:00 | Sales: three order files | sales | quality manager |
| 09:45 | Purchasing: suppliers, goods receipt | purchasing | quality manager |
| 10:30 | Production, measuring equipment, inductions – on site | head of production | quality manager |
| 11:15 | Installation, complaints | head of installation | MD (because the quality manager heads installation) |
| 11:45 | Evaluation by the auditors | – | quality manager + MD |
| 12:15 | Closing meeting (15 min) | all | quality manager |
Three rules for the plan: 30 to 45 minutes per area, never more. Plan time for the evaluation before the closing meeting. Enter the auditor for each area – that is the evidence of independence.
The templates for the audit programme (Excel) and audit plan (Word) are provided by the Academy in the company package (German); the exercise on this comes in module 5 on the practice company.
Key point
Programme = when what. Plan = who, when, how long, with whom. Order along the customer order.
Independence in a five-person company
The standard does not require that an auditor is an “outsider”. It requires that the auditor does not audit his or her own work. That can be solved in a small company – if it is made visible in the audit plan.
Four ways
| Situation | Solution | Evidence |
|---|---|---|
| The quality manager also heads an area (e.g. installation) | The quality manager audits all other areas; his or her area is audited by management or a colleague | Column “auditor” in the audit plan |
| Two persons who do everything | Cross audit: A audits the areas of B and vice versa; leadership is audited by whoever is not the MD | Audit plan |
| One-person company or nobody is free | External auditor (consultant, colleague from a friendly company) – permitted and usual | The audit report names the external person |
| The managing director wants to audit personally | That is allowed – except the process “leadership”, for which the MD is responsible | Audit plan: leadership by the quality manager or an external person |
What the certification body wants to see
The report says who audited what. Nothing more. A line “Installation: audited by M. Waldner (MD), because T. Waldner (quality manager) heads installation” answers the question before it is asked.
The most frequent mistake
The quality manager writes the whole report alone, including his or her own area – and the external auditor finds this in stage 1. That is the nonconformity that is easiest to avoid.
Key point
Independent means: not auditing your own work. The audit plan says who audits whom.
Reviewing documents: 20 minutes, not two days – and exercise 1
Before the audit you do not have to read everything – you have to read the right five things and choose the samples from them. Guide value for a company with up to 30 employees: 20 minutes.
| Minutes | What you read | What you note |
|---|---|---|
| 3 | Last internal report + action plan | Numbers of the actions whose effectiveness you check |
| 3 | Last external report | Observations of the certification body – it checks those first next time |
| 4 | Process list, core processes in the manual | 3–5 own rules that are easily not kept (“no Y without X”, “yearly”) |
| 4 | Complaints list, objectives sheet | 1 complaint and 1 objective each as a starting point for the talk |
| 3 | Order list | Three order numbers: one completed, one current, one with a problem |
| 3 | Supplier, measuring equipment and training lists | Entries older than one year, entries without a date, new ones without an entry |
Do not read beforehand: the whole manual (it is the claim – you check the reality), the standard, all order files, reports older than two years.
The one question after the 20 minutes: Which three rules would I most likely consider not to be lived – and on which case do I see that? That is your audit plan in one sentence.
📄 Checklist preparation in 20 minutes (PDF) (German – English version to follow)
Exercise 1: audit plan for the practice company
From the Waldner folder draw up a half-day audit plan: areas along the order flow, times, interviewees, auditor for each area. Pay attention to who heads installation at Waldner. Compare with the sample solution (Ü1) only afterwards.
Key point
20 minutes of preparation, three order numbers, three rules – the audit plan does not need more.
The basic rule: “Let us take your last …”
All good audit questions have the same beginning: “Let us take your last …” – order, purchase order, complaint, new employee, calliper. The question meets the interviewee where he or she is at home, and always ends at the evidence: the document, the list, the sticker on the device.
| Question about the standard (avoid) | Question about a case (ask) | Evidence |
|---|---|---|
| “Have you implemented clause 8.2.3?” | “Let us take your last new customer: how did the enquiry become the order, and who checked that you can deliver?” | Enquiry, quotation, order confirmation, feasibility note |
| “Is there a supplier evaluation?” | “Show me your most important supplier: why do you buy there, and what happens if it fails tomorrow?” | Supplier list with evaluation, alternative supplier |
| “Is measuring equipment calibrated?” | “Which calliper is in the bench room right now? How do I recognise that it has been checked?” | Marking, measuring equipment list |
Three sentences that carry the audit day
- “Let us take your last …” – starts every topic at the case.
- “How would you show me that?” – the one follow-up question when somebody explains instead of showing. It decides everything: either the evidence exists or it does not.
- “I will note that as an observation; it will be classified afterwards.” – when something is missing. Never say “nonconformity” at the workplace.
Then: be silent. Most auditors talk too much. Whoever has asked the question and stays quiet is shown the case.
Probing without interrogating
If something is missing, ask about the procedure, not about the blame: “How does this normally run?” – “What would have to be different so that it does not happen again?” The answer to the second question is later the cause in the action plan – named by the company itself.
Key point
From the case to the evidence, never from the standard to the case. And then be silent.
Opening and closing meeting: no surprises
Two meetings of five to ten minutes each decide whether the audit is experienced as help or as control.
Opening (5 minutes, all interviewees present)
- Purpose: “Today we look together at whether what we have defined runs that way in everyday work – and where we can make it easier for ourselves.”
- Approach: “I ask you to show me things on a concrete case. Not explain – show.”
- Separation of system and person: “I audit procedures, not people. If something is missing, that is a point for the company.”
- Rules of the game: “‘I do not know’ and ‘somebody else does that’ are good answers. Guessing helps nobody.”
- Schedule and time: the plan is on display, 40 minutes per area, closing meeting at 12:15 – no surprises in the report.
Closing (10 minutes, management and process owners)
- Overall picture first – one sentence. Nobody should have to wait for the verdict.
- Strengths – at least three, concrete with an example.
- Findings – read out each with evidence and requirement, then: “Do you see that differently? Have I overlooked something?” Objection now, not after the report.
- Explain the classification – “Nonconformity, because we have defined in the manual … and it is missing in two of three files. Observation, because it is an isolated case.”
- Start on causes – “What do you think it is due to?” Note the answers, do not judge them.
- Next steps – report by Friday, action plan together in two weeks, effectiveness after three months, result into the management review.
Three things that ruin the closing meeting: findings that nobody has heard before. Reading out clauses of the standard instead of naming the case. Dispute about the classification without evidence – if the evidence is missing, delete the finding.
📄 Guide for the opening and closing meeting (PDF) (German – English version to follow)
Key point
The opening takes away the fear, the closing takes away the surprise. Together both take a quarter of an hour.
Interviewing leadership: objectives, risks, management review
The managing director is the interviewee with whom questions about the standard fail fastest. “Do you know the quality policy?” produces a nod. “What became of your most important objective from the beginning of the year?” produces a conversation – and evidence.
The four topics the boss must know
| Topic | Question | Evidence |
|---|---|---|
| Objectives (6.2) | “Let us take your most important quality objective: where do you stand today, and what did you do when it got tight?” | Objectives sheet with target value, current value, date, action |
| Risks and opportunities (6.1) | “Which entry in your risk list did you last adapt, why, and what became of it in day-to-day business?” | Risk list with date of change, one piece of evidence for the implemented action |
| Management review (9.3) | “Which figures were on the table, and which decision arose from them that is visible in the company today?” | Minutes with inputs, decisions, persons responsible, status |
| Deputies | “If you are absent for three weeks from tomorrow: who does what, and how does this person know how it works?” | Deputy rule, access to passwords and templates, an example |
What the boss may delegate
Maintaining the lists, writing the minutes, evaluating the KPIs. What the boss cannot delegate is the decision: the management review is one only if decisions with persons responsible and dates result from it – and if at the next audit somebody can say what became of them.
Typical finding in this interview
“Minutes of the management review 2025 name decision (2) second glass supplier by 09/2026; status 10/2026: quotation available, sampling open; no new date set.” – That is an observation, not a reproach: the decision is being followed up but has not been given a new date.
Key point
Objective with status, risk with action, decision with implementation – three pieces of evidence, three questions.
From order to invoice: the common thread
One single order, followed from enquiry to invoice, covers eight clauses of the standard – without any of them having to be named. That is why you take three orders as a sample: one completed, one current, one with a problem (delay, change, complaint).
The stations and their evidence
| Station | Question | Evidence | Clause |
|---|---|---|---|
| Enquiry | “How did the enquiry come in, and where is it recorded what the customer wanted?” | Enquiry sheet, e-mail, note of the talk | 8.2.1 |
| Quotation | “Who checked that you can deliver what you promise?” | Quotation with approval note, feasibility note | 8.2.2, 8.2.3 |
| Order | “Where is the confirmation to the customer?” | Order confirmation or countersigned customer purchase order | 8.2.3 |
| Change | “Did the customer change anything in between – how did that get into production?” | Change e-mail in the file, note on the production order | 8.2.4, 8.5.6 |
| Production/service | “Which dimension sheet was at the workplace, and is it the one from the file?” | Production order with revision status | 8.5.1 |
| Traceability | “Which material, which batch is in this order?” | Delivery note of the supplier, batch/serial number | 8.5.2 |
| Release/handover | “Who checked before delivery, and where is that recorded?” | Final inspection with initials, handover record with the customer's signature | 8.6 |
| Invoice | “Do invoice, quotation and time recording agree?” | Invoice in comparison | 7.5.3 |
Count, do not feel
If the order confirmation is missing in one of three files, that is an observation. If it is missing in two of three, it is a nonconformity – if the manual requires it. The number decides, not the impression. That is why always three cases, never only one.
The favourite mistake of companies
For the audit the best order is picked out. Take it gladly – and in addition the last one in the list and the one with the complaint. Announce this in the opening, then it is not mistrust.
Key point
Three orders, eight stations, each with evidence. The number decides on the classification.
Purchasing, employees and measuring equipment, complaints
Three areas in which small companies most often receive findings – and in which the questions are simplest.
Purchasing: the three questions (8.4)
- Selection: “Show me your last new supplier: what made you conclude that it can deliver?” – first delivery, sample, approval note.
- Evaluation: “Let us take your three most important suppliers: when did you last evaluate whether they still deliver well enough, and what followed from it?” – list with date and criteria (quality, deadline, complaints). No points system necessary; a consequence (“supplier C: delivery time criticised, talk 03/2026”) is worth more than grades.
- Goods receipt: “Let us take the last delivery: what did you check, where is that recorded, and what happened with the last problem?” – delivery note with tick, initials, date; one complaint case with feedback to the supplier.
The fourth question, which hits every boss: “What happens if this supplier fails tomorrow?” – plan B in the risk list.
Employees, training, measuring equipment (7.1.5, 7.2)
Questions are asked at the workplace, with the device in hand. “Let us take the journeyman who is at the CNC machine today: when was he inducted, where is that recorded?” – induction record with signature. “Which measuring device is used most often here – how do I see that it has been checked?” – marking and measuring equipment list. Internal checking against a gauge block is permitted; nobody needs a laboratory. And: “Let us take an employee whose qualification expires next month: how do you know that?” – list of deadlines or qualification matrix with expiry dates.
Complaints: the last complaint as the touchstone (10.2)
“Let us take your last complaint: how did it run from receipt to closure, what was the cause, and how did you notice that the action worked?” Clause 10.2 requires exactly these three things – determine the cause, implement the action, review effectiveness – but no form. If the column “cause” is missing in the list, that is an improvement; if nobody can name the cause, it is an observation.
📄 Catalogue of questions part 4 – purchasing (PDF) (German – English version to follow) · 📄 Part 5 – employees, training, measuring equipment (PDF) (German – English version to follow) · 📄 Part 6 – complaints (PDF) (German – English version to follow)
Key point
Purchasing: selection, evaluation, goods receipt. People: ask at the workplace. Complaint: cause, action, effect.
Sector special: production, services, trade, on-site services
The standard is the same for everyone, the evidence is not. Four sector families, four focal points – each with a collection of 25 real audit questions including evidence.
Production and trades
Focal points: traceability (which batch is in the order), inspection (first part, final inspection, measuring equipment at the workplace), scrap and blocking (marking, quarantine area), drawing status (is the same revision at the workplace as in the file?). Typical weak point: a measuring device “from the cupboard” that is in no list.
📄 Sector questions production and trades (PDF) (German – English version to follow)
Services, consulting, IT
Without a machine what remains to be checked: competence (qualification matrix, onboarding, access rights), release of work results (four-eyes principle for report, quotation, release), customer data and backups (when was a restore last tested?), project control (planned and actual dates, customer information in case of delay). Typical weak point: the backup test that never took place.
📄 Sector questions services, consulting, IT (PDF) (German – English version to follow)
Trade and logistics
From goods receipt (quantity, condition, article number against delivery note) via inventory management (minimum stock, stock-taking difference), marking and storage conditions to returns and delivery reliability. In addition dispatching: does the employee deployed have the required authorisations – and was that checked before the assignment? Typical weak point: the shop shows available, the warehouse is empty.
📄 Sector questions trade and logistics (PDF) (German – English version to follow)
Cleaning, security, care, staffing services
Distributed sites mean distributed evidence: site instruction on the spot, induction and briefing with signature, equipment check with sticker (in Germany according to the DGUV rules), dosing and safety data sheet at the place of use, inspection records of the site visits. Typical weak point: the new employee who has been alone at the site for three months without an induction plan having been filled in.
📄 Sector questions cleaning, security, care, staffing (PDF) (German – English version to follow)
Key point
Same standard, different evidence. Before the audit choose three questions from your sector – not 25.
Nonconformity, observation, improvement – classifying correctly; the eight false assumptions
The rule is short: Only what the standard or the company itself requires can be a nonconformity. Everything else is improvement – or in order.
The decision tree
- Does the standard require it – or has the company prescribed it for itself? No → improvement or in order. Yes → continue.
- Do I have evidence (document, number, place, date)? No → observation, look for evidence; without evidence no finding. Yes → continue.
- Is the requirement not fulfilled at its core – systematically (several cases) or with a consequence (customer, safety, product)? Yes → nonconformity.
- Isolated case, requirement fulfilled at its core, but a gap with risk? Yes → observation. No → improvement.
Two rules of thumb: if the company breaks its own rule, that is a nonconformity – the alternative is to change the rule, not to ignore it. And: one case in ten is an observation, three in ten are a nonconformity. That is why always check several cases.
The eight false assumptions
What auditors like to demand although it is not in ISO 9001:2015:
| Assumption | What the standard says |
|---|---|
| Quality management representative appointed in writing | 5.3: assign roles and make them known – the “management representative” has been deleted since 2015; an organisation chart is enough |
| A quality manual is mandatory | 7.5: documented information to the extent the company considers necessary for effectiveness – the word manual does not occur |
| Every process needs a description | 4.4: determine processes, document “to the extent necessary” – a process list is enough |
| Suppliers must be certified | 8.4.1: the company determines the criteria for selection and evaluation |
| Version number and approval note on every sheet | 7.5.3: control – available, suitable, protected; filing in the system with a date is control |
| Measuring equipment must be calibrated externally | 7.1.5.2: calibrate or verify – also internally against a gauge block |
| Forms for context, interested parties, risks | 4.1, 4.2, 6.1: determine and consider – no documented information required |
| Customer satisfaction by questionnaire | 9.1.2: monitor perception – method free (talks, complaints, follow-up orders, handover records) |
But: if the company has defined one of these things itself, the rule applies – and its absence is a finding. Therefore: promise less, keep more.
Key point
Requirement – evidence – frequency. Without a requirement no nonconformity, without evidence no finding.
Writing a finding: evidence, requirement, gap – and what runs well belongs in it too
A finding is three sentences long. First sentence: what did I see (evidence). Second: what is required (requirement – place in the manual, clause of the standard in brackets). Third: what is missing, how often, with what consequence (gap). Then the classification.
Bad and good
❌ “8.2.3 not fulfilled. Sales works sloppily.”
✓ “Order 2026-118 (quotation 30 April, production order 6 May) contains no order confirmation; order 2026-131 was produced on the basis of a customer purchase order without it being countersigned. Manual section 7.2 step 4 requires the order confirmation before the production order is created (ISO 9001 8.2.3). Affected: 2 of 3 orders checked; consequence in case 2026-118: complaint R-26-03. – Nonconformity.”
The good finding names numbers, dates, the place in the manual, the number 2 of 3 and the consequence. It can be verified, and it accuses nobody.
Words that you delete
| Delete | Instead |
|---|---|
| “sloppy”, “deficient”, “bad” | Number and evidence: “2 of 3 files without …” |
| “must be improved” | Name the gap – the action comes from the company |
| “does not conform to the standard”, “8.2.3 not fulfilled” | Quote the company's own rule, clause of the standard in brackets |
| “partly”, “often”, “sometimes” | “in 2 of 3”, “since 11/2024” |
| “raise awareness”, “pay attention to it” | Cause plus change to the procedure (mandatory field, date, template) |
What runs well belongs in it too
At least three strengths, concrete: “Order file 2026-104 complete from enquiry to invoice – suitable as a template for induction in sales.” Not: “The documentation is good.” Strengths are in the report before the findings. They motivate the company – and the certification body reads them as a sign that the auditor looked closely.
📄 Wording patterns: six pairs bad/good (PDF) (German – English version to follow)
Key point
Evidence, requirement, gap – three sentences. No value judgements. Three strengths before the findings.
Audit report in 45 minutes, action plan, management review
The report is the only thing that remains of the audit. It is read by two people: the management and the certification body. For both the rule is: 2 to 4 pages, result first.
Structure in five sections
- Scope and method – which processes, which samples (order numbers, measuring equipment, persons), who audited what.
- Result in one sentence – “The QM system is established and effective; two nonconformities concern rules that the company has set itself.”
- Strengths – three, concrete.
- Findings – three sentences each, numbered (A1, A2, H1, H2, V1), with classification.
- Note for the management review – objectives behind schedule, trends, topics for the next meeting.
Left out: the structure of the standard as an outline, descriptions of processes that work (one sentence with a sample is enough), recommendations without reference to a finding.
Action plan: cause before action
| Column | What belongs in it | What does not |
|---|---|---|
| Cause | named by the company: “production order can be created without an order confirmation” | “carelessness” |
| Action | changes the procedure: mandatory field, date in the calendar, template | “employees made aware” |
| Who / by when | one person, one date | “sales”, “promptly” |
| Check of effectiveness | who checks when and on what: “quality manager checks 10 files from 12/2026 in February” | empty |
Clause 10.2 requires exactly this: determine the cause, implement the action, review effectiveness. An action without a check of effectiveness is the first question at the next external audit.
Deriving the management review from the audit
The audit result is a mandatory input (9.3.2 c). One paragraph is enough: number and type of findings, status of the actions, trend compared with the previous year. In a small company one report or set of minutes is enough for the management review – a meeting is possible but not required: inputs according to 9.3.2 in order, then decisions with person responsible and date, next time the status of implementation.
The templates for the audit report (Word), action plan (Excel) and management review (Word) are provided by the Academy in the company package (German). Exercise 4 at the end of the case study uses them.
Key point
2 to 4 pages, result first. Cause before action. Every action with a scheduled check of effectiveness.
Case study: internal audit at the Waldner joinery – exercises 2 to 4
The situation: Schreinerei Waldner GmbH, 14 employees, windows and front doors, interior fitting and made-to-measure furniture, certified since 2024. You are the internal auditor. The folder from module 1 contains organisation chart, process list, extract from the manual, three order files, complaints list, supplier list, training records, measuring equipment list and the last management review. The quality manager (T. Waldner) also heads installation.
Exercise 2: ten questions for the head of production
Word ten questions for the interview with R. Hadar – all according to the basic rule, all with the evidence you want to see. Example: “Let us take production order FA-2026-131, which is currently running: how do you see at the workplace which dimension sheet applies after re-measuring following the plastering?” – evidence: dimension sheet with the re-measurement entry of 8 July at the workplace.
Exercise 3: classifying six observations
Six observations result from the folder. Classify each one and give reasons with requirement and evidence – before you read on.
- Orders 2026-118 and 2026-131 without order confirmation or countersignature; manual 7.2 step 4 requires it before production begins.
- Supplier evaluation last carried out 11/2024; manual 8.4 says “yearly in November”; supplier E without evaluation since 02/2026.
- Calliper MS-03 in use for ±0.5 mm, without check date and without marking; the other five measuring devices are in order.
- Induction plan of the fitter who has been in the company since 03/2026 contains only the name.
- Complaints list without the columns “cause” and “action”; evaluation only yearly.
- No written appointment of the quality manager – only in the organisation chart and in the job description.
Solution: 1 and 2 are nonconformities (own rule systematically not kept; in 1 with a consequence: complaint R-26-03). 3 and 4 are observations (isolated cases, requirement fulfilled at its core). 5 is an improvement (10.2 requires determining the cause, but no column). 6 is in order – ISO 9001:2015 no longer knows an appointed representative; that is the trap from the false assumptions.
Exercise 4: report and action plan
Write the Waldner report on 2 to 4 pages and the action plan with cause, action, person responsible, date and check of effectiveness. Make sure that the action for A1 changes the procedure (“mandatory field date of order confirmation in the production order”), not awareness. Then compare with the sample solution.
📄 Sample solutions Ü1 to Ü4 (PDF) (German – English version to follow) · 📄 Action plan Waldner (Excel) (German – English version to follow)
Key point
Two nonconformities, two observations, one improvement, one trap – whoever recognises the trap has understood classification.
Getting through the external audit: 20 points, transition to ISO 9001:2026, final project
What the certification body does with your report
It reads it in stage 1 – for completeness, independence, evidence and effectiveness of the actions. In stage 2 it uses your findings as a starting point for its own questions: whoever has a nonconformity on the order confirmation in the internal report is presented with three order files in the external audit. That is a good thing – an honest internal report with followed-up actions is the best argument you have. An internal report without any finding at all, on the other hand, makes auditors suspicious.
The 20 points at which small companies fail
Condensed from more than 1,000 audits: objectives without a measured value · management review without decisions · risk list unchanged for years · no deputy for the management · orders without order confirmation · changes only orally · on-time delivery not measured · supplier evaluation outdated · new suppliers without approval · goods receipt without inspection note · a supplier without plan B · wrong drawing status at the workplace · final inspection without a record · missing traceability · measuring equipment without check date · maintenance not demonstrable · new employees without induction record · expiring qualifications not monitored · complaints without cause · last year's findings open. For each point there is one piece of evidence that clears it – the checklist names it.
📄 Checklist 20 points with evidence (PDF) (German – English version to follow)
ISO 9001:2026 – what changes for the audit
The revision was published on 16 September 2026. The structure stays, the processes stay. Additionally coming into view: climate change as a context issue (already since the 2024 amendment), quality culture, ethics and integrity as a responsibility of top management, the planning of changes and a clearer link between risks and opportunities and the objectives. For the internal audit this means: the same questions, plus “Have you assessed whether climate change is relevant for you?” and “Let us take your last major change: how did you assess consequences and resources beforehand?” Until the transition in your own cycle the new requirements of the 2026 edition are improvement, not nonconformity – with the exception of climate change, which the standard has required since the 2024 amendment. The transition period is 36 months from publication (expected until 30 September 2029); your certification body states the binding dates.
📄 Brief overview ISO 9001:2026 for the audit (PDF) (German – English version to follow)
Final project: your first audit of your own
A morning in your own company – or a second Waldner audit (installation, complaints, training). Seven steps, evaluation grid with ten criteria of 0/1/2 points each, passed from 14 of 20. Most points are lost in the wording of the findings and with actions without a cause – both can be improved at the desk.
📄 Project instructions and evaluation grid (PDF) (German – English version to follow) · 📄 FAQ sheet: the 15 most frequent questions on the internal audit (PDF) (German – English version to follow)
Key point
The certification body looks for starting points in your report, not for errors. Give it honest ones.
Procedure in our company
Your company completes this module. The general part of the training ends here — how internal audits actually run in your company, only your company knows.
This information belongs in it:
| Item | What is to be entered |
|---|---|
| Management of the audit programme | Who plans the audit programme (quality manager, management)? Where is the current multi-year matrix? |
| Internal auditors | Names, areas, qualification; who may audit which area — and which not (independence rule) |
| Audit plan template | Where is the template, how many days in advance is it sent, to whom? |
| Classification of findings | Which categories does the company use (conformity, improvement potential, minor, major or its own), who decides in case of doubt? |
| Audit report | Template, deadline after the audit, distribution list, who approves? |
| Action tracking | Which list (action plan, ticket system), who tracks, when is effectiveness checked? |
| Filing and retention | Where are programme, plans, reports kept; for how long are they retained? |
| Certification body and dates | Who certifies, when is the next external audit, by when must internal audits be completed? |
| Special feature of your company | e.g. several sites, customer audits, combined audits ISO 9001 / 14001 / 45001 |
For management
The independence rule is the point that most often remains unclear in a small company. Lay down in writing who audits whom — and who checks the QMS itself when the quality manager built it.
Records: auditor competence and audit evidence
Finally, what makes this training an evidence — and what the certification body wants to see on the topic of internal audits.
Evidence of auditor competence (clause 7.2)
ISO 9001 requires documented information as evidence of competence. For internal auditors that means in practice:
- Training certificate — this certificate with date, contents and result
- Entry in the qualification matrix or in the training plan: “internal auditor ISO 9001”
- optional: participation in an audit under guidance, evaluation by the person managing the audit programme (ISO 19011, 7.6)
- Refresher: the standard names no period. Usual is a refresher at a revision of the standard (ISO 9001:2026!), after a longer break and at the latest every three years.
A certificate alone does not make an auditor — but without a certificate or equivalent evidence the certification body lacks the basis to recognise the competence.
Evidence of the audit programme (clause 9.2.2 f)
| Evidence | What it proves |
|---|---|
| Audit programme (matrix) | all areas and clauses are covered in the cycle |
| Audit plans | criteria and scope were defined per audit |
| Audit reports | results were reported to management |
| Action plan with effectiveness check | corrective actions without undue delay |
| Management review | audit results were evaluated by management (clause 9.3.2 c) |
What is on this certificate
Name, course, date, result, the complete list of training contents with reference to the standard and a verifiable certificate number. This makes the evidence what an auditor would demand himself: verifiable.
To remember
The certification body asks two questions: “Who carried out the internal audit — and how do you demonstrate his competence?” Certificate plus qualification matrix answer both.
Final test
35 questions, one correct answer each. You need 28 correct answers to pass (80 %). Scoring happens on the server — there is no answer key on this page.
Your result
Certificate on LinkedIn

Holger Grosser, QM-Guru Akademie
How helpful was this course?
Should your colleagues take it too?
Pass the course link on – free, no registration. With a company code all certificates end up in the same company account.
What happens next
The method training first: Online training “Internal Auditor ISO 9001” in the Academy – free, with certificate as evidence of competence according to clause 7.2.
Company-specific additional part: Module “Procedure in our company” as a fixed-price adaptation with your templates, your independence rule and your classification.
Have the internal audit carried out externally: If nobody in the company can audit independently: we carry out the internal audit according to ISO 9001 for you – including report, action plan and management review.
Practise with an AI auditor: Trial audit ISO 9001 and practice training Internal Auditor with an AI auditor in the QM-Guru Academy (German).
More free training courses are available in the Online Academy (German). Questions about implementation in your company: use the contact form.
Questions about the content of this training: Holger.grosser@iso9001.info · phone 0911-49522541. Online training fulfils the legal training duty only if you can ask the trainer questions.